Beamrider
Kombi
marking fluid
testimonial
advantage
photo gallery
beamrider video
kombi video
AEROSOL PAINT vs. BULK MARKING FLUID
1 Field, Standards Dims
30 weeks per year.
AEROSOLS

Initial Layout (twice a year)
2 cases per = 4 cases

Over marking (weekly)
1 case per x 28 = 28 cases
32 cases per Year, per Field
@ $30 per case = $ 960.00 US
Plus Disposal Fees $ 50.00 US
$ 1,010.00 US
*$ 33.66 per week
or
Over marking (weekly)
1/2 case per x 28 = 14 cases
18 cases per Year, per Field
@ $30 per case = 540.00 US
Plus Disposal Fees $ 50.00 US
590.00 US
*$ 19.66 per week


Assumptions;
1 Can = 18 ounces
12 Cans = 216 Ounces
1 Case = 1.68 Gallons
32 Cases = 53.76 Gallons Total for the Year
28 Cases = 47.04 Gallons Total for the Year

MARKING FLUID

Initial Layout (twice a year)
½ Gallon to 2.5 Gallons water per =
1 Gallon @ 5:1 mix or 6 gallons Mixed

Over marking (weekly)
1 gallon @ 8:1 mix per x 28 = 28 gallons
@ 8:1 Mix with 2 gallons left in Bucket #1 = 16 gallons
plus Bucket #2 use 1.5 gallons @ 8:1 = 12 gallons
28 Gallons Mixed
34 Gallons Mixed Total for the Year
1.5 Gallons Marking Fluid Total for the Year

Actual Materials Used = 1.5 Buckets of, 3 Gallon Fluid = $75.00
*$2.50 per week
Actual Costs = 2, 3 gallon buckets @ $ 50.00 each
$ 100.00 for the year
*$3.33 per week

Assumptions;
1 Bucket = 3 Gallons Concentrated Suspended Chalk Marking Fluid
@ 5:1 Mix (5 parts water to 1 part fluid)= 15 Gallons Per Bucket
@ 8:1 Mix (8 parts water to 1 part fluid)= 24 Gallons Per Bucket

Cost and time studies using the BeamRider laser guided line marker - Municipalities
Mark out a soccer pitch from new
Study revealed an average of 2 hours per pitch to complete this task using traditional methods
Traditional method
3 hours per pitch
2 man operation @ £15.00 ($26.67) each per hour

Total of £90.00 ($178.00) per pitch

Total for 25 pitches = £2250.00 ($ 4,451.00)

BeamRider
1 hour per pitch
2 man operation @ £15.00 ($26.67) each per hour

Total of £30 ($59.34) per pitch

Total for 25 pitches = £750.00 ($1,483.97)

Saving of £1500.00 ($2,967.90 USD)
Study 2
Initial mark a high volume of soccer pitches prior to new season
Traditional method
2 hours per pitch
2 man operation @ £15.00 ($26.67) each per hour

Total of £60.00 ($118.72) per pitch
Total for 250 pitches =
£15,000.00 ($ 29,680.40)

BeamRider
1 hour per pitch
2 man operation @ £15.00 ($26.67) each per hour

Total of £30 ($59.34) per pitch
Total for 250 pitches =
£7,500.00 ($ 14,840.76)

Saving of £7500.00 every year ($ 14,840.76 USD)
Benefits of using the BeamRider Field Striper
We briefly set out below how our system meets the environmental requirements demanded from machinery utilised at major, college and recreational sporting venues and summarise the benefits gained from purchase of our BeamRider laser guided system.

We feel confident that our system will not only save you and your facility money but will also allow all to example how through using world leading technology perfect presentation of the field can be achieved while meeting the requirements for field preparation stipulated from the sports ruling body be it soccer, football, La Crosse or any other.
Requirement
Typical gasoline line striper
Dollar $ cost
BeamRider & Kombi line striper
Dollar $ cost
Servicing Monitor and change oil, monitor engine condition, incl. belts, fuel lines, pipe work, air filter, timing & ignition, spark plug, etc., etc. From $40.00 per month One filter needing occasional cleaning, clean pipe work (using on-board water tank), charge batteries. N/A
Noise pollution Typically above 85dB N/A Less than 3db N/A
Powered by Gasoline Yes, depending on usage Battery only N/A
Fumes output Carbon Monoxide plus other noxious gases N/A None N/A
Risk of fire High risk from fuel and oil N/A None N/A
Water usage when cleaning Cleaning of pipe work and tanks required Variable On-board separate water tank allows complete pipe cleaning in 15 seconds using minimal water. Paint can be left in main tank for up-to one full week and be re-used. N/A
Risk of explosion Yes - high N/A None N/A
Risk of injury to operator Yes, many powered parts on engine, clutch and wheels Variable None N/A
Risk of spillage of fuel or oil on playing surface Yes Variable None N/A
Summary

Operator and other benefits
• No requirement to call in surveyors to find corners at beginning of season
• Quick set-up time
• Eliminates the need of string lines
• Operator error correcting
• Maintenance free and easily cleaned with ZERO running costs. (excl. battery charge)
• Easily transportable between sites
• Time and cost saving
• Ensures all lines are laser straight and the field is perfectly square
• Aids the decision making judgements of referees and linesmen
• An efficient and easy way to produce and replicate high quality workmanship (week after week)

Further examples of benefits
• Perfect, straight and uniform lines
• Allows a high quality and standard of workmanship to be achieved week after week
• Easy to operate – anyone can use the system
• Self correcting and maintenance free software – Operators cannot make mistakes in line straightness and quality, deviations are automatically detected
• Can be used periodically to quickly and efficiently straighten and correct previous pitch markings, saving time and money
• Environmentally friendly method to mark out pitches
• Operator friendly and self correcting software – you cannot produce a wobbly line
• Easily cleaned and maintained
• Multi-tasking – mark out playgrounds, tennis, netball, etc accurately and easily
• Guaranteed client/customer satisfaction
• Efficient and easy way to produce high quality work

If you mark out 280 pitches per year (8 pitches, 36 times) you save £6912.00 ($12,441.00)
If you mark out 360 pitches per year (10 pitches, 36 times) you save £8640.00 ($15,552.00)
If you mark out 720 pitches per year (20 pitches, 36 times) you save £17,280.00 ($31,504.00)


 
   
© 2007 CA. FIELD SUPPLY CO.
650-280-5603